Control system design
Station-specific architecture, pump control logic, control interfaces and alarm requirements.

Wastewater infrastructure · PLC automation · Centralised control
OWARE Solutions executed the control system engineering, programmable logic controller (PLC) programming, testing, commissioning and Central Control Room integration for a rehabilitation programme spanning multiple wastewater pumping stations across Bahrain.
The rehabilitation required each station’s local controls to manage pumping and interlocks while exchanging station status, alarms and authorised commands with the Central Control Room.
Station status and alarms flow toward the control room. Remote commands return through station controls.
Conceptual diagram. No live operational data.
Wet-well level, pump status and equipment faults inform local operation.
The PLC sequences duty and standby pumps, applies protective interlocks and reports alarms.
The control room receives status and alarms and can issue remote commands through station control interfaces.
Station-specific architecture, pump control logic, control interfaces and alarm requirements.
Duty/standby pump alternation, wet-well level control, operating sequences, safety and protection interlocks, fault detection and alarms.
PLC logic and functional control testing, alarm and interlock validation, and pre-commissioning verification.
Site startup, functional commissioning, verification of station controls, operational acceptance testing and integration validation.
Station connectivity, remote monitoring and control, central alarm management and station status visibility.
The completed controls and integration support coordinated wastewater operations, remote monitoring and faster response to operational alarms.